Sebago Technics was retained in 2019 by the Town of Cape Elizabeth to complete new sidewalk construction along Ocean House Road (Route 77) in accordance with the Town Center Master Plan.


Location

Cape Elizabeth, Maine

Sector

Municipal

Services

  • Civil Engineering
  • Traffic Engineering
  • Planning & Permitting

Completed

2023

A concrete sidewalk runs beside a road, lined with young trees and green grass, with a rock outcrop and shrubs on the left side under a clear blue sky.

Project overview

The project was separated into two phases: one to operate as a Municipal Partnership Initiative (MPI) through the Portland Area Comprehensive Transportation System (PACTS) and the second as a Locally Administered Project (LAP) with MaineDOT.

project Details

Improving walkability in Cape Elizabeth

Design efforts for both phases were initiated in 2020 with federal funding, with Phase I proceeding toward a bidding package and Phase II to Plan Impacts Complete (PIC). Sebago presented at a public meeting on behalf of both projects. The design of both segments included a new granite curb with associated drainage, esplanade space for street trees and pedestrian scale lighting, and a six-foot concrete sidewalk. In addition, Sebago completed utility coordination efforts and the survey for Phase I. Phase I required temporary rights to construct, requiring Sebago to complete a right-of-way plan and temporary maintenance easement language for sign-off by the abutter.

Phase I was constructed as Phase II began the right-of-way process. Sebago completed the utility coordination process in tandem and coordinated with the Town and MaineDOT as needed through discussions with the abutters.

Plans, Specifications, and Estimate (PS&E) were submitted to MaineDOT to receive construction authorization. Sebago aided the Town through the bidding process, ran a pre-bid meeting, responded to Requests for Information (RFI), and aided in awarding the contract to the successful bidder. Construction of Phase II was completed in 2023.